Project management and consultancy

Cost management, quantity take-off and BOQ

We take off the project item by item, price it with unit rates and track the budget against actual cost throughout the work.

A pencil on a dimensioned structural drawingIllustrative image

What is this service?

Quantity take-off means measuring the quantity of every work item from the drawings: how many cubic metres of concrete, tonnes of reinforcement, square metres of finishes, how many doors. Multiplying these quantities by unit rates gives the bill of quantities (BOQ). Cost management means tracking this budget against actual cost throughout the work.

A well-prepared take-off lets you compare bids on the same scope, tie payments to work done and avoid disputes over variations. DEMAFT always prepares its quotes item by item, with quantities and unit prices.

Cost management, quantity take-off and BOQ

Which problems does it solve?

  • 01

    Lump-sum bids where no one knows what is included and what is not.

  • 02

    Bids that cannot be compared because they rest on different scopes.

  • 03

    Payments that cannot be tied to the actual quantity of work done.

  • 04

    Budget overruns noticed only when the work is finished.

  • 05

    Disputes over which item a variation belongs to.

How is it carried out?

Quantities are taken off the architectural and structural designs and, if needed, measured on site. Each item is listed with its description, unit and quantity; unit rates are set with their material, labour and equipment components in mind. The estimate and the quote are thus built on the same item list.

During execution the quantity of work done is measured against this list; interim payments are prepared from the actual quantities, and the budget is regularly compared with actual cost. If the scope changes, the new item is defined and priced separately.

Which phases does it cover?

  1. 01

    Design and site information

    Architectural and structural designs, on-site measurement if needed.

  2. 02

    Item list and take-off

    The description, unit and quantity of every work item.

  3. 03

    Unit rate analysis

    Unit rates with material, labour and equipment components.

  4. 04

    BOQ and estimate

    Item-by-item cost, total budget and payment plan.

  5. 05

    Budget tracking and payments

    Comparing actual quantities and cost with the budget.

What you gain

  • You know item by item what you are paying for.
  • You compare bids on the same scope.
  • Payments are tied to the actual quantity of work done.
  • Budget deviations show up early.
  • Variations are recorded as separate items.
DEMAFT

How DEMAFT runs it

Every DEMAFT quote defines the scope item by item, with quantities and unit prices; the programme and payment plan are part of the quote. Item-by-item quantities and reporting are the basis of our transparency principle: we want our clients to know at every stage what they are paying for and where the work stands.

We have applied this approach at very different scales, from 7,116 mass and social housing units to a stadium complex and the finishing works of a single villa. If you are building a villa in Türkiye, you can also see an approximate cost range with villamaliyeti.com (in Turkish), which uses DEMAFT’s cost database.

Get to know the company

Frequently asked questions

What is the difference between a take-off and a BOQ?

The take-off is the quantity of each work item. The bill of quantities (BOQ) lists those quantities with unit rates and gives the total cost.

What is the difference between a lump sum and unit rates?

A lump sum gives one total price for the work; with unit rates each item’s quantity and rate are listed and payment follows the quantity done. An itemised quote keeps the scope clear in both cases.

Can I see the cost of a villa in advance?

Yes. DEMAFT’s free tool villamaliyeti.com (in Turkish) takes off the quantities automatically from the plot, floors, rooms and quality level and gives a cost range. The firm price comes from a quote with quantities.

Modern two-storey villa with a pool and gardenIllustrative image
Villa cost calculator

Estimate the cost of building your villa in minutes

Planning a villa or detached house in Türkiye? Start with villamaliyeti.com, DEMAFT’s free calculator (in Turkish). Choose your plot, floors, rooms and quality level; DEMAFT’s cost database works out the quantities and the pricing.

  • Quantities are taken off automatically: structure, facade, windows, finishes
  • City price differences, wastage and contingencies are included
  • The result is a cost range, not a single figure
  • A report with the cost breakdown is sent to your email