HomeAboutServicesProjectsBlogContact
TRENRUFR
Contact us
Services

Construction services in 6 fields

From a single trade to a turnkey project, we work to the scope you need. Below: what we do in each field, and our projects in it.

019 projects

Contracting and turnkey housing

We run the whole process, from structure to handover, on mass and social housing, shopping centres and public buildings. In Algeria we delivered projects of 5,100 and 1,016 homes, and in Istanbul one of 1,000 homes.

What we do in this field

  • Structure
  • Finishing works
  • Infrastructure
  • Landscaping
  • Turnkey delivery
  • Site management

Learn more: Turnkey construction and contracting

023 projects

Private villa projects

Villas and mansions in Bishkek, Yaoundé and Maryland. We design and carry out the finishing trades: timber cladding, natural stone, bespoke furniture and lighting.

What we do in this field

  • Timber doors, panelling and ceilings
  • Natural stone and marble
  • Bespoke furniture
  • Lighting design
  • Bathrooms, spa and pool
  • Landscaping and exterior

Learn more: Villa and private mansion construction

032 projects

Shooting ranges and defence-security facilities

50 m and 100 m indoor ranges in Bishkek: moving and electronic targets, bullet-resistant cladding, ricochet-proof ceilings and ventilation.

What we do in this field

  • Moving and pop-up targets
  • Electronic target and scoring system
  • Bullet-resistant wall cladding
  • Ceiling baffles
  • Acoustic insulation
  • Ventilation and fume extraction

Learn more: Indoor shooting range and defence-security facility construction

041 project

Stadiums and sports facilities

In Tizi Ouzou: a football stadium, an athletics stadium, training pitches and access roads.

What we do in this field

  • Football stadium
  • Athletics stadium
  • Training pitches
  • Access roads
  • Infrastructure
  • Landscaping

Learn more: Stadium and sports facility construction

50,000seat stadium complex
052 projects

Building strengthening and renovation

Kitchen, bathroom, basement and facade renewal in about 20 villas in Maryland; a home renovation in Üsküdar, Istanbul.

What we do in this field

  • Kitchen and bathroom renewal
  • Flooring, paint and plaster
  • Interior reconfiguration
  • Basement finishing
  • Electrical, lighting and plumbing
  • Exterior, terrace and deck

Learn more: Building strengthening and renovation

061 project

Project management and consultancy

Planning, cost, programme and site coordination from survey to handover: we manage the project on behalf of the owner or investor.

What we do in this field

  • Survey and needs analysis
  • Cost and quantities
  • Work programme
  • Site coordination
  • Reporting on the owner’s behalf

Learn more: Construction project management

  1. 01Survey
  2. 02Quotation
  3. 03Planning
  4. 04Construction
  5. 05Handover
Services

Our capabilities

On our turnkey projects and the work we run on behalf of owners, every discipline is managed under one coordination. Each one is explained on its own page.

Modern two-storey villa with a pool and gardenIllustrative image
Villa cost calculator

Estimate the cost of building your villa in minutes

Planning a villa or detached house in Türkiye? Start with villamaliyeti.com, DEMAFT’s free calculator (in Turkish). Choose your plot, floors, rooms and quality level; DEMAFT’s cost database works out the quantities and the pricing.

  • Quantities are taken off automatically: structure, facade, windows, finishes
  • City price differences, wastage and contingencies are included
  • The result is a cost range, not a single figure
  • A report with the cost breakdown is sent to your email
Calculate the villa costvillamaliyeti.com · free · in Turkish · DEMAFT
Process

How we work

The same discipline on every project: first we listen, then we measure, plan and build.

Step 1 / 5

Survey

We inspect the site, its current condition and your expectations on location.

  • On-site inspection
  • Current condition and measurements
  • Needs and budget meeting
Step 2 / 5

Quotation

We prepare an itemised quote, with quantities and unit prices, that defines the scope line by line.

  • Itemised scope
  • Quantities and unit prices
  • Schedule and payment plan
Step 3 / 5

Planning

We agree the design, the work programme, materials and crew plan with you.

  • Design and detail drawings
  • Work programme
  • Materials and crew plan
Step 4 / 5

Construction

We run structural and finishing works under one coordination and report progress regularly.

  • Structural and finishing works
  • Site coordination
  • Regular progress reports
Step 5 / 5

Handover

We complete the inspections, fix any snags and hand the project over turnkey.

  • Inspections
  • Snagging
  • Turnkey handover
Let’s talk about your project