HomeAboutServicesProjectsBlogContact
TRENRUFR
Contact us
About

An İzmir-based contractor building on 4 continents

We are a construction company with 14 projects in Türkiye and abroad. Through our US affiliate CNK Contracting LLC we provide licensed contracting in Maryland.

Lounge with lighting details in the private luxury mansion
14Projects
5Countries
4Continents
7,116Mass and social housing units
Entrance with a marble floor and timber cabinets, private luxury mansion
Who we are

From structure to handover, from a single hand

DEMAFT Dış Ticaret İnşaat is a contractor based in Bayraklı, İzmir. From structure to finishes, from bespoke fabrication to landscaping, we manage every stage of a project from a single hand.

Besides Türkiye, we have delivered housing, villa, stadium, public building, commercial and shooting range projects in Kyrgyzstan, Algeria, Cameroon and the USA. In the USA we work through our affiliate CNK Contracting LLC, licensed in the State of Maryland.

Company
DEMAFT Dış Ticaret İnşaat Sanayi ve Ticaret Ltd. Şti.
Founder
Alper Cankaya
US affiliate
CNK Contracting LLCLicensed contracting in the State of Maryland
Head office
Folkart Towers, Bayraklı / İzmir
Why DEMAFT

Four things that set us apart

01

One contractor

Every trade from structure to turnkey runs under one contract and one coordination.

02

International experience

We have delivered projects in 5 countries, under different regulations, climates and supply conditions.

03

Fine craftsmanship

Detailed work in timber panelling, natural stone, bespoke furniture and lighting.

04

Technical facility know-how

In indoor shooting ranges, the complete installation from target systems to ballistic cladding.

Our culture

What we care about as we build

Our vision is to be a trusted contractor in Türkiye and abroad: to make a difference in the lives of our clients, our people and our surroundings by delivering work that is right, on time and transparent.

Safety

Safety first

We aim for an accident-free workplace on every site. We assess the risks before work starts, and apply protective equipment and site rules together with our crews and subcontractors.

  • Risk assessment
  • Personal protective equipment
  • Daily site checks
A crew at work on an indoor shooting range site
Quality

Quality and craftsmanship

In every trade from structure to finishes, we build on site exactly the materials and details the project specifies. We work with craftsmanship that goes into the detail in timber, stone and bespoke fabrication.

  • Material and detail approval
  • Stage inspections
  • Pre-handover checklist
Bedroom with a marble floor and ceiling details
Innovation

Technology and innovation

We adopt new materials, systems and methods when they bring a measurable benefit. In indoor shooting ranges we have installed technical systems from electronic target and scoring systems to ballistic cladding.

  • Electronic target and scoring systems
  • Acoustic and ballistic solutions
  • Itemised quantities and reporting
Shooting booths with electronic targets
Environment

Environment and sustainability

We plan materials carefully to cut waste, keep our sites clean and orderly, and prefer durable, low-maintenance solutions.

  • Less waste and offcuts
  • Clean, orderly sites
  • Durable materials
A villa with a garden, Maryland
Ethics and transparency

Ethics and transparency

Itemised quotes, written processes and regular progress reports: we want our clients to know at every stage what they are paying for and where the work stands.

  • Itemised quotes
  • Written contract and process
  • Regular progress reports
A corridor during timber ceiling cladding
Partnership

Our partners

We value fair, open and long-term relationships with our subcontractors and suppliers. We are open to partnership proposals for tenders in Türkiye and abroad.

  • Subcontractor collaboration
  • Tender and consortium partnerships
  • Supplier collaboration
Assembly of the shooting booths
Countries

We have built on four continents.

Projects in 6 cities across Europe, Asia, Africa and North America.

  • Istanbul Türkiye4 projects
  • Bishkek Kyrgyzstan3 projects
  • Yaoundé Cameroon3 projects
  • Oran Algeria2 projects
  • Tizi Ouzou Algeria1 project
  • Maryland USA1 project