HomeAboutServicesProjectsBlogContact
TRENRUFR
Contact us
Stadiums and sports facilities

Stadium and sports facility construction

We work on sports complexes made up of football and athletics stadiums, training pitches, access roads and infrastructure. A 50,000-seat stadium complex in Tizi Ouzou, Algeria.

A stand under construction with steel frames and cranesIllustrative image

What is this service?

A stadium complex is not a single building: next to the main stadium, the athletics track, training pitches, the access roads that carry spectators and vehicles, utility networks and landscaping are designed and built together. At this scale many crews and trades must move forward on the same timeline.

DEMAFT takes on these complementary works as well as the main structures on stadium and sports facility projects; we treat the complex as one whole.

Stadium and sports facility construction

Which problems does it solve?

  • 01

    The main stadium, ancillary facilities, roads and infrastructure moving on different timelines and holding each other up.

  • 02

    Quantities and costs that cannot be tracked item by item at large scale.

  • 03

    Spectator and vehicle access, the roads, being left to the end.

  • 04

    Many subcontractors clashing on the same site.

How is it carried out?

Work starts with a programme covering the whole complex: the main stadium, athletics stadium, training pitches, roads and infrastructure are sequenced on one plan. Quantities and costs are taken off item by item, and the material and crew plan is tied to the programme.

On site, infrastructure and access roads progress alongside the buildings, so access is ready when the complex is complete. The facility is handed over after landscaping and final inspections.

Which phases does it cover?

  1. 01

    Scope and programme

    Sequencing every building and work package of the complex in one programme.

  2. 02

    Infrastructure

    Utility networks and site preparation.

  3. 03

    Main stadium

    The structure of the football stadium and spectator areas.

  4. 04

    Ancillary facilities

    Athletics stadium and training pitches.

  5. 05

    Access roads

    Roads for spectator and vehicle access.

  6. 06

    Landscaping and handover

    External works, inspections and handover.

What you gain

  • Every part of the complex follows one programme.
  • Roads and infrastructure are ready together with the buildings.
  • Quantities and costs are tracked item by item.
  • Subcontractors work under one coordination.
DEMAFT

How DEMAFT runs it

In Tizi Ouzou, Algeria, we worked on a stadium complex made up of a 50,000-seat football stadium, an athletics stadium, training pitches, access roads, infrastructure and landscaping.

On work of this scale we follow the one-contractor principle: every trade runs under one contract and one coordination. Experience gained in 5 countries, under different regulations, climates and supply conditions, helps us plan large projects abroad.

Get to know the company

Frequently asked questions

Which works do you take on in stadium projects?

Football and athletics stadiums, training pitches, access roads, infrastructure and landscaping. The Tizi Ouzou complex covered all of these.

Do you take part in sports facility tenders abroad?

Yes. We are also open to partnership and consortium proposals for tenders in Türkiye and abroad.