Contracting and turnkey housing
We run the whole process, from structure to handover, on mass and social housing, shopping centres and public buildings. In Algeria we delivered projects of 5,100 and 1,016 homes, and in Istanbul one of 1,000 homes.
14 projects in housing, villas, public buildings, stadiums and defence facilities. From our head office in İzmir to Bishkek, from Algeria to Cameroon and the USA, we take on a whole project or any part of it.
From a single trade to a turnkey project, we work to the scope you need.
We run the whole process, from structure to handover, on mass and social housing, shopping centres and public buildings. In Algeria we delivered projects of 5,100 and 1,016 homes, and in Istanbul one of 1,000 homes.

Villas and mansions in Bishkek, Yaoundé and Maryland. We design and carry out the finishing trades: timber cladding, natural stone, bespoke furniture and lighting.

50 m and 100 m indoor ranges in Bishkek: moving and electronic targets, bullet-resistant cladding, ricochet-proof ceilings and ventilation.
In Tizi Ouzou: a football stadium, an athletics stadium, training pitches and access roads.
Kitchen, bathroom, basement and facade renewal in about 20 villas in Maryland; a home renovation in Üsküdar, Istanbul.
Planning, cost, programme and site coordination from survey to handover: we manage the project on behalf of the owner or investor.
Highlights from 14 completed and ongoing projects in 5 countries.

From structure to finishes: timber doors, panels and ceilings, natural stone, bespoke furniture, lighting, spa and pool.
See the project

Private luxury mansionSee the project
50 m indoor shooting rangeSee the project
100 mindoor range
100 m indoor shooting rangeSee the project
Villa renovations (~20 villas)See the project
05
Private mansionSee the project
06
Petrol stationSee the project
07
Siège L’ARTSee the project
50,000seats
Tizi Ouzou stadium complexSee the project
22storey guesthouse
Avcılar Municipality student guesthouseSee the project
10
KoruFlorya Shopping and Living CentreSee the project
11
Private residence renovationSee the project
1,000homes
KİPTAŞ Esenyurt phase 5See the project
5,100homes
OPGI social housingSee the project
1,016homes
CNEP Bank social housingSee the project
The same discipline on every project: first we listen, then we measure, plan and build.
We inspect the site, its current condition and your expectations on location.
We prepare an itemised quote, with quantities and unit prices, that defines the scope line by line.
We agree the design, the work programme, materials and crew plan with you.
We run structural and finishing works under one coordination and report progress regularly.
We complete the inspections, fix any snags and hand the project over turnkey.
Our vision is to be a trusted contractor in Türkiye and abroad: to make a difference in the lives of our clients, our people and our surroundings by delivering work that is right, on time and transparent.
We aim for an accident-free workplace on every site. We assess the risks before work starts, and apply protective equipment and site rules together with our crews and subcontractors.
In every trade from structure to finishes, we build on site exactly the materials and details the project specifies. We work with craftsmanship that goes into the detail in timber, stone and bespoke fabrication.
We adopt new materials, systems and methods when they bring a measurable benefit. In indoor shooting ranges we have installed technical systems from electronic target and scoring systems to ballistic cladding.
We plan materials carefully to cut waste, keep our sites clean and orderly, and prefer durable, low-maintenance solutions.
Itemised quotes, written processes and regular progress reports: we want our clients to know at every stage what they are paying for and where the work stands.
We value fair, open and long-term relationships with our subcontractors and suppliers. We are open to partnership proposals for tenders in Türkiye and abroad.
Projects in 6 cities across Europe, Asia, Africa and North America.

Choose your topic so that the right person gets back to you; the contact form opens with that topic selected.
Housing, a villa, a public building or a special facility: ask for a quote for a turnkey project or a single trade.
Ask for a quote02We welcome proposals for tenders, consortia and joint projects in Türkiye and abroad.
Propose a partnership03Introduce your company and references to work with us as a subcontractor or supplier.
Introduce your companyWrite to us about a turnkey project, a single trade, or a tender and partnership; we will listen and get back to you.