HomeAboutServicesProjectsBlogContact
TRENRUFR
Contact us
Project 04 / 14

Villa renovations (~20 villas)

Design and build across about 20 villas, in different projects.

A renovated villa, Maryland
Location
Maryland
Country
USA
Field of work
Building strengthening and renovation
Executed by
CNK Contracting LLC

Scope of work

9 items
  • Kitchen design and build
  • Bathroom design and build
  • Flooring
  • Paint and plaster
  • Interior reconfiguration
  • Basement finishing
  • Electrical and lighting
  • Plumbing
  • Exterior, terrace, deck
Field of workBuilding strengthening and renovationKitchen, bathroom, basement and facade renewal in about 20 villas in Maryland; a home renovation in Üsküdar, Istanbul.Explore this service
Villa renovations (~20 villas)

Photographs from the project

2 photographs

A renovated villa, MarylandWall panelling during a renovation
Modern two-storey villa with a pool and gardenIllustrative image
Villa cost calculator

Estimate the cost of building your villa in minutes

Planning a villa or detached house in Türkiye? Start with villamaliyeti.com, DEMAFT’s free calculator (in Turkish). Choose your plot, floors, rooms and quality level; DEMAFT’s cost database works out the quantities and the pricing.

  • Quantities are taken off automatically: structure, facade, windows, finishes
  • City price differences, wastage and contingencies are included
  • The result is a cost range, not a single figure
  • A report with the cost breakdown is sent to your email
Calculate the villa costvillamaliyeti.com · free · in Turkish · DEMAFT